• Create an auditorium with retractable seating (in current space)
    • Create two new music rooms (in current gymnatorium space)
    • Create a secure entrance for students and visitors
    • Create central office/ meeting location
    • Create a new nurse’s office with privacy for students
    • Upgrade/ remodel all restrooms in the building
    • Repair cracked flooring
    • Add parking on South Street (by new entrance)
    • Replace wall pads in the gym
    • Repair brick on the front of the building
    • Replace exterior windows
    • Replace classroom doors
    • Install handicapped accessible push buttons on main entrance doors
    • Replace wall tile
    • Upgrade Home and Careers room
    • Relocate and/or replace greenhouse